Departmental Bulletin Paper Problems in the Public Procurement Process in Local Governments in Indonesia

Damayrkti, Intan Permatasari  ,  Deguchi, Chikashi  ,  Agoes Soehardjono  ,  Anwar, M. Ruslin

44pp.135 - 143 , 2015-07-31 , 宮崎大学工学部
Indonesian local governments must put to bid all construction works that will cost more than $16,950 according to Presidential Regulation No. 35 of 2011. The local governments always use the Knockout System in the auction process which has a different auction flow with the Presidential Decree No.80 of 2003. Research data were obtained through questionnaires and surveys in the Blitar Regency and the Batu Municipality, and methods were used to describe the analysis and Importance Performance Analysis (IPA).###The auction process should be conducted through some evaluations, such as the administrative evaluation, technical and the final evaluation of technique and costs. These are different from the bidding process of Direct Appointment with the Public Tender in the located Arithmetic. The Public Tender must have a Pre-Occupational Safety and Health Plan Contract (Pre-RK3K) and Quality Management to pass the Administration Evaluation, but the Direct Appointment was not the main requirement of the bidding process.

Number of accesses :  

Other information